Our production process flow
 
   
 

Technical Process

 
   
 

 

 
 

Drying
  1. Make sure of pile-up density according to different specifications and humidity of timbers.
2. Dry at different time and under different temperature according to different timbers and different temperatures.
3. Timber can be taken out of drying chamber until 15 ° C.
 
     
 

Raw Material
  1. Cogging Procedures: opening } finish plane } breaking
2. All-round examination for cogging.
3. Testing items for semi-finished products. Surface: being flat and slippery, with no burr and crack. Sizes: conforming to customer's final confirmed sample or drawing.

 
     
 

Painting
  1、The silk-screen printing standard:
Surface: no color come off, cutting line, no mistake in placement, clear picture.

 
     
 

Silk-Screen Printing
  1. All finished products are subject to all-round examination by quality inspection department.
2. Testing Items
Surface: being flat and slippery, no burr, firmly connected with no crack. Sizes: conforming to customer's final confirmed sample.

 
     
 

Assembly
  1.Painting Procedures: Polishing } Priming } Polishing } Oil Blowout
2. The purchased paint and ink should be confirmed to be nontoxic before use by authoritative quality inspection organizations. (Intertek, SGS, ACTS)
3. Lacquering Standard Surface: conforming to customer's requirements on brightness, surface being slippery, evenly painted, with no fading and paint remains. Color: conforming to customer's final confirmed sample, with no chromatic aberration in the same lot.

 
     
 

Packing
  Package Examination:
Auxiliary Materials: the label, color box, bar code and etc. should conform to the product and contract stipulations.
Quantity: conforming to the quantity stipulated in contract.

 
     
 

Warehousing
  Finished products are warehoused only after they are certified to sampling examination by factory's quality inspection department.